Search 

Campaigns

Affiliates

Partners

Redesigned Pits

Redesigning pits can decrease the amount of surface disturbance.If a pitless drilling system is not used for drilling fluids, another approach may be to use a V-shaped pit instead of the traditional rectangular pit. This type of pit reduces water requirements, as well as the amount of surface disturbance.

The design is as follows: the open end of the "V" faces the drilling rig and the cross-sectional view resembles a squared-off funnel (about 10 feet deep with the upper 5 feet having slanted walls to a width of about 20 feet). Because the fluid must travel the full length of the pit, this design prevents mud from channeling between the discharge point and the suction point, and reduces the amount of water that must be added to maintain the desired fluid characteristics. In addition, because the V-shaped pit is long and narrow, it is easier to construct and leaves a smaller "footprint" at the site. [1]

A company installed a V-shaped reserve pit and compared the costs with those incurred at similar-sized wells using a traditional pit. The company determined
that pit construction time was reduced by about 40 percent, water costs for the well were reduced by about 38 percent, and pit liner costs were reduced by about
43 percent. The total cost savings were about $10,800 per well. [2]

It should be noted that whenever earthen pits are used to store wastes, they should be lined with multiple layers of synthetic fabric with leak detection devices between the layers.


[1] Railroad Commission of Texas, Oil and Gas Division.

[2] Railroad Commission of Texas, Oil and Gas Division.

Community Voices

Custer National Forest, MT

"Rancher Not Informed about Mineral Leasing" is Jeanie Alderson's story about what it means when the federal government owns the minerals below private land - mainly, that surface owners have little or no input into the leasing process or decisions that will greatly affect their lives and livelihoods.